Do You Have A Renewable Energy Project We Can Help With?

Delano, California

On this project Team Braun facilitated the installation of underground conduit, overhead power-lines, and interconnecting A/C and D/C wiring. The Braun Electric team also managed the connections between transformers and terminated the connections to local utilities.

Project Details

DATE

April, 2017

PROJECT TYPE

Solar Energy

Project Gallery

El Segundo, California

This project consisted of the installation of a solar photovoltaic (PV) carport system on the top of a garage port and adjacent rooftop. In addition, a battery storage system was also installed near an existing electrical network.

Project Details

PROJECT TYPE

Solar Energy / Battery Storage

Project Gallery

Kern County, California

Braun Electric recently completed a significant solar project located in the heart of Kern County, emphasizing their expertise in ground mount systems. Through careful planning, they installed an advanced 2PACK solar panel AC 5000KW / DC 7000KW system. This initiative highlights their commitment to innovation and efficiency in energy infrastructure development.

Project Details

DATE

January, 2024

PROJECT TYPE

Solar Power Generation Facility

Project Gallery

Wasco, California

This solar based project located in Wasco was a 4.9 megawatt solar installation completed over nine months, totaling more than 12,000 man-hours. Braun Electric’s scope of work included underground feeder and conduit installation, inverter and combiner rack builds, full DC and AC terminations, and the setup of all communication systems including fiber, Cat-6, and RS-485. Our team also handled grounding, transformer placement, overhead pole installation, and both cold and hot commissioning. The project showcased Braun Electric’s ability to deliver high-quality, efficient, and technically complex renewable energy solutions on time and within scope.

Project Details

DATE

March, 2025

PROJECT TYPE

Solar Power Generation Facility

Project Gallery

Visalia, California

Braun Electric successfully completed a large-scale solar infrastructure project featuring a 4.2MW solar field. The team provided electrical services to 5,567 photovoltaic modules and 14 inverters, and installed two 4000A main disconnects, a 2500kVA step-up transformer, and a 2500kW step-down transformer. The project also included integration of a Battery Energy Storage System (BESS), a Data Acquisition System (DAS), fiber optic communications, and an overhead power line (OHPL).

Project Details

DATE

April, 2024

PROJECT TYPE

Battery Energy Storage System (BESS)

Project Gallery