Do You Have An Overhead Line Project We Can Help With?

North Midway Sunset, California

This project consisted of building a 115kv pole line which connected two substations. The project spanned approximately 2.5 miles (4.2 Kilometers) in length including a crossing over state highway 33.

Project Details

DATE

August, 2016

PROJECT TYPE

Overhead High Voltage

Project Gallery

blank

San Jose, California

A solar transmission line project with two 21kv power lines for a total of approximately 4 miles (4.2 Kilometers) of distribution. The lines material consisted of primarily wood and steel. Direct embedded wood monopole tangents, guyed wood monopole running angles, guyed and non-guyed wood monopoles dead ends, and self-supporting steel dead ends on drilled concrete piers all showcase Braun Electric’s quality craftsmanship and attention to detail.

Project Details

DATE

April, 2022

PROJECT TYPE

Overhead High Voltage

Project Gallery

blank