Bakersfield, California
This project consisted of the removal and disposal of existing parts within the substation. The members of Braun Electric also furnished and installed all of the replacement equipment. Some of the equipment that was replaced included power lines, insulators, and field switches. Team Braun also replaced and updated the entire battery room for the facility.
Project Details
DATE
January, 2023
PROJECT TYPE
Substation Refurb
Project Gallery