North Midway Sunset, California
This project consisted of building a 115kv pole line which connected two substations. The project spanned approximately 2.5 miles (4.2 Kilometers) in length including a crossing over state highway 33.
Project Details
DATE
August, 2016
PROJECT TYPE
Overhead High Voltage
Project Gallery
San Jose, California
A solar transmission line project with two 21kv power lines for a total of approximately 4 miles (4.2 Kilometers) of distribution. The lines material consisted of primarily wood and steel. Direct embedded wood monopole tangents, guyed wood monopole running angles, guyed and non-guyed wood monopoles dead ends, and self-supporting steel dead ends on drilled concrete piers all showcase Braun Electric’s quality craftsmanship and attention to detail.
Project Details
DATE
April, 2022
PROJECT TYPE
Overhead High Voltage