North Midway Sunset, California
This project consisted of building a 115kv pole line which connected two substations. The project spanned approximately 2.5 miles (4.2 Kilometers) in length including a crossing over state highway 33.
Project Details
DATE
August, 2016
PROJECT TYPE
Overhead High Voltage
Project Gallery



San Jose, California
A solar transmission line project with two 21kv power lines for a total of approximately 4 miles (4.2 Kilometers) of distribution. The lines material consisted of primarily wood and steel. Direct embedded wood monopole tangents, guyed wood monopole running angles, guyed and non-guyed wood monopoles dead ends, and self-supporting steel dead ends on drilled concrete piers all showcase Braun Electric’s quality craftsmanship and attention to detail.
Project Details
DATE
April, 2022
PROJECT TYPE
Overhead High Voltage
Project Gallery



Arvin, California
On this project, Braun Electric completed overhead power line (OHPL) upgrades and expansion in Arvin, California. The work involved testing 53 existing poles and constructing five new spans of 4160V OHPL. Two poles on the existing line were also replaced using helicopter-assisted installation to ensure efficiency and minimize ground disturbance.
Project Details
DATE
January, 2024
PROJECT TYPE
Overhead High Voltage
Project Gallery

Visalia, California
Braun Electric provided key overhead and underground electrical infrastructure for a ground mount solar installation in Visalia, California. The team built 12 spans of 21kV double-circuit OHPL with fiber under-builds and installed four 21kV riser poles to support underground power distribution.
Project Details
DATE
On Site, 2025
PROJECT TYPE
Overhead High Voltage / Fiber Install
Project Gallery